Submission Number: 15586
Submission ID: 66050
Submission UUID: 4df73f2c-7e87-4231-b4ba-47406c7f3f81

Created: Thu, 01/19/2023 - 18:10
Completed: Thu, 01/19/2023 - 18:10
Changed: Thu, 02/09/2023 - 14:56

Remote IP address: (unknown)
Submitted by: admin
Language: English

Is draft: No
Current page: webform_submission_import

Locked: Yes
Corrections Dept
Ericksen Ellison and Associates, Inc.
96190
Study and Document Review for Mold Remediation
78WR0007
Needed a study to determine HVAC contributions/solutions (interim and permanent) for mold remediation.
Project Duration
Mon, 07/20/2015 - 00:00
Wed, 09/30/2015 - 00:00
Wed, 09/30/2015 - 00:00
Yes
{Empty}
Contract Amounts
$4000.00
$0.00
$4000.00
Yes
CAPRA
Yes
Within guidelines for emergency and single source - did previous study so process could be stream-lined for emergency work.
Glen Heino
glen.heino@state.mn.us
Satisfactory – The Consultant performed in an average manner that demonstrated an acceptable understanding of the owner’s requirements and contract requirements. The consultant’s overall performance is equal to any negative performance. The Consultant has contributed to the success of the project.
Satisfactory – The Consultant performed in an average manner that demonstrated an acceptable understanding of the owner’s requirements and contract requirements. The consultant’s overall performance is equal to any negative performance. The Consultant has contributed to the success of the project.
Satisfactory – The Consultant performed in an average manner that demonstrated an acceptable understanding of the owner’s requirements and contract requirements. The consultant’s overall performance is equal to any negative performance. The Consultant has contributed to the success of the project.
Satisfactory – The Consultant performed in an average manner that demonstrated an acceptable understanding of the owner’s requirements and contract requirements. The consultant’s overall performance is equal to any negative performance. The Consultant has contributed to the success of the project.
Yes
n/a
4 - satisfied